Building Hope: BGE’s Role in Sarasota’s Heroes’ Village for Veterans
In a moment that feels both long overdue and urgently necessary, St. Vincent De Paul CARES, in partnership with the Gulf Coast Community Foundation, unveiled Heroes’ Village — a permanent, affordable housing community built exclusively for veterans. As the nation grapples with rising housing costs, mental health challenges, and the lingering effects of war on those who served, this project stood as a beacon of hope. And behind its foundation — literally and figuratively — is the work of BGE’s Sarasota Office, which provided civil engineering design, permitting, and construction phase services to help bring this vision to life.
From the earliest stages of planning to the final phase of construction, BGE’s Sarasota team was deeply involved in shaping Heroes’ Village. Their civil engineering design ensured the site was functional, sustainable, and compliant with local regulations. Their permitting expertise helped navigate the complex approval process, and their construction phase services ensured the project stayed on track and on budget.
But more than technical expertise, BGE brought heart to the project. This wasn’t just another job — it was a chance to contribute to something meaningful. Every sidewalk, drainage system, and utility connection was part of a larger mission: to create a safe, welcoming space for those who’ve sacrificed so much.
While Heroes’ Village is a powerful step forward, it’s just the beginning. The need for veteran housing remains urgent, and the model established here can, and should, be replicated. BGE is committed to continuing its work on projects that matter, using engineering as a tool for social impact.
As the need for veteran support grows, Heroes’ Village offers a clear message: we honor our veterans not just with words, but with action. And BGE is proud to have helped lay the foundation.
Key Takeaways
- Targeted Site Design: BGE’s team optimized the site layout to accommodate residential needs while meeting regulatory and environmental standards.
- Streamlined Permitting Pathway: Strategic coordination with local agencies enabled efficient permitting, accelerating project timelines without compromising compliance.
- Construction Phase Precision: On-site engineering support ensured smooth execution, minimized delays, and maintained alignment with design intent throughout the build.
- Collaborative Delivery Model: BGE worked closely with city officials, developers, and nonprofit partners to integrate technical expertise with community-driven goals.
Conclusion
Heroes’ Village exemplifies how strategic infrastructure delivery can address urgent housing needs through coordinated public-private collaboration. By aligning technical execution with community-focused outcomes, BGE helped deliver a solution that meets regulatory standards, supports long-term affordability, and enhances operational sustainability. As demand for veteran housing continues to grow, this project serves as a scalable model for municipalities and developers seeking to integrate engineering precision with social impact. BGE remains committed to partnering on initiatives that advance resilient, purpose-driven communities. .
For expert assistance with your projects, contact BGE today.
Project
Image Gallery
Explore the project gallery to see how our commitment to excellence serves our clients and community.



