

Our Projects
From civil engineering endeavors to complex infrastructure projects, take a deep exploration into the process and results of BGE’s many successful collaborations.
Showing 31 – 45 of 73
-
Feathercrest Lift Station
The SAWS Feathercreast project involved the construction of a new lift station and extensive sewer line and pipeline network to alleviate capacity issues in northeast San Antonio, overcoming significant construction challenges.
-
IH 30 Rockwall County Improvements
BGE, Inc. partnered with TxDOT to expand and modernize a 17-mile stretch of I-30, overcoming complex challenges like lake crossings and urban constraints to improve safety and mobility for the Dallas-Fort Worth region.
-
IH 635/Dallas North Tollway Split Diamond Traffic Signal Design
BGE collaborated with TxDOT to design and install innovative traffic signal solutions for the Dallas North Tollway and IH 635 intersections.
-
City of Houston Asset Management
BGE assessed over 3,000 groundwater assets in Houston, prioritizing critical infrastructure for replacement and maintenance to ensure reliable water supply over the next 20 years.
-
City of Houston Southeast Water Purification Plant
BGE successfully rehabilitated Houston’s Southeast Water Purification Plant, increasing its efficiency and capacity to meet the city’s growing water needs.
-
Multiple Sewershed Package 10B
The SAWS Multiple Sewershed Package 10B Project involved the replacement of over 4,000 linear feet of sewer lines in San Antonio, utilizing trenchless methods to minimize disruptions and coordinate with various agencies for necessary permits.
-
Loop 410 Elevated Storage Tank
BGE designed a 1.5 million-gallon composite elevated storage tank, including site evaluation, pipeline routing, mechanical/electrical systems, and demolition of the existing steel tank.
-
Cinco MUD 1
Cinco MUD 1 implemented a multi-pronged approach to reduce water usage, including reclaimed water infrastructure, brackish groundwater development, and community education, saving millions of dollars and preserving precious water resources.
-
SH 21 Super 2 Widening and Rehabilitation
BGE designed a cost-effective Super 2 passing lane solution for a high-traffic, two-lane stretch of SH 21, improving safety and driver satisfaction while minimizing right-of-way impacts.
-
Dallas North Tollway Phase 4A
BGE designed the first phase of the Dallas North Tollway extension, addressing rapid growth in Collin County and connecting Dallas to northern communities.
Testimonial
BGE is truly one team. All departments work together to provide excellent services to our clients. I enjoy working with the engineers to develop design plans that not only comply with the environmental regulations but also provide a design that exceeds the clients’ expectations.
Katelyn Heikkinen
Environmental SR. Project Manager – Frisco
Testimonial
From the first time I walked through the front doors of BGE, I could feel the family atmosphere. This makes for an enjoyable work experience. This fantastic atmosphere comes from the top all the way down to every employee.
David Salley
Director of Design and Production – Houston
Testimonial
At BGE, I get the opportunity to use the skills I have developed as an environmental scientist. Each day is a host to new challenges and provides continuous opportunities to learn and progress. I get to work with a strong team of professionals on a wide variety of project types in diverse locations. I also have the chance to create a positive impact in my community and help to protect the environment while doing so.
Josh Baker
Sr. Environmental Scientist – Frisco
Testimonial
BGE is a great place to work. The culture is family-oriented and flexible, and the people are awesome. As a senior project manager, I get to interact with both the BGE team as well as my clients. Believe me – you will be valued for your input as a member of this team.
Lizanne Douglas
Senior Project Manager – Houston