Filters

Services
Locations
Award Winning
Award Winning

Showing 31 – 45 of 73

  • Feathercrest Lift Station

    The SAWS Feathercreast project involved the construction of a new lift station and extensive sewer line and pipeline network to alleviate capacity issues in northeast San Antonio, overcoming significant construction challenges.

    Read More

  • Dunham Pointe

    BGE developed Dunham Pointe, a 1,327-acre master-planned community in Cypress, TX, offering diverse residential, office, retail, and commercial spaces connected by parks and green corridors.

    Read More

  • The Vintage

    BGE provided comprehensive engineering services for the development of The Vintage, a 530-acre mixed-use project in Texas, including the design of infrastructure for residential, commercial, and recreational areas, such as the Kickerillo-Mischer Preserve.

    Read More

  • A grey map highlighting IH 30 County exits

    IH 30 Rockwall County Improvements

    BGE, Inc. partnered with TxDOT to expand and modernize a 17-mile stretch of I-30, overcoming complex challenges like lake crossings and urban constraints to improve safety and mobility for the Dallas-Fort Worth region.

    Read More

  • IH 635/Dallas North Tollway Split Diamond Traffic Signal Design

    BGE collaborated with TxDOT to design and install innovative traffic signal solutions for the Dallas North Tollway and IH 635 intersections.

    Read More

  • A water pipe at emptying fresh water into a trough

    City of Houston Asset Management

    BGE assessed over 3,000 groundwater assets in Houston, prioritizing critical infrastructure for replacement and maintenance to ensure reliable water supply over the next 20 years.

    Read More

  • The main concrete supports of SH 249 Extension

    SH 249 Extension

    As the General Engineering Consultant, BGE is overseeing design and construction activities for this 26-mile roadway.

    Read More

  • City of Houston Southeast Water Purification Plant

    BGE successfully rehabilitated Houston’s Southeast Water Purification Plant, increasing its efficiency and capacity to meet the city’s growing water needs.

    Read More

  • Multiple Sewershed Package 10B

    The SAWS Multiple Sewershed Package 10B Project involved the replacement of over 4,000 linear feet of sewer lines in San Antonio, utilizing trenchless methods to minimize disruptions and coordinate with various agencies for necessary permits.

    Read More

  • Loop 410 Elevated Storage Tank

    BGE designed a 1.5 million-gallon composite elevated storage tank, including site evaluation, pipeline routing, mechanical/electrical systems, and demolition of the existing steel tank.

    Read More

  • Cinco MUD 1

    Cinco MUD 1 implemented a multi-pronged approach to reduce water usage, including reclaimed water infrastructure, brackish groundwater development, and community education, saving millions of dollars and preserving precious water resources.

    Read More

  • Fast moving cars zooming by on the IH 35 Waco 4B reconstruction designed by BGE, Inc.

    IH 35 Waco 4B

    This 7-mile, $341 million project, considered the largest design-bid-build project in Texas, required collaborative problem-solving.

    Read More

  • SH 21 Super 2 Widening and Rehabilitation

    BGE designed a cost-effective Super 2 passing lane solution for a high-traffic, two-lane stretch of SH 21, improving safety and driver satisfaction while minimizing right-of-way impacts.

    Read More

  • An aerial view of the extended North Tollway under construction from BGE, Inc.

    Dallas North Tollway Phase 4A

    BGE designed the first phase of the Dallas North Tollway extension, addressing rapid growth in Collin County and connecting Dallas to northern communities.

    Read More

  • A BGE team member flying a drone while standing next to a white truck

    Solaeris

    As surveying consultant, BGE employed a UAV to collect and merge boundary, topographic, tree, and platting data for this planned MPUD.

    Read More

Testimonial

BGE is truly one team. All departments work together to provide excellent services to our clients. I enjoy working with the engineers to develop design plans that not only comply with the environmental regulations but also provide a design that exceeds the clients’ expectations.

Katelyn Heikkinen
Environmental SR. Project Manager – Frisco

Testimonial

From the first time I walked through the front doors of BGE, I could feel the family atmosphere. This makes for an enjoyable work experience. This fantastic atmosphere comes from the top all the way down to every employee.

David Salley
Director of Design and Production – Houston

Testimonial

At BGE, I get the opportunity to use the skills I have developed as an environmental scientist. Each day is a host to new challenges and provides continuous opportunities to learn and progress. I get to work with a strong team of professionals on a wide variety of project types in diverse locations. I also have the chance to create a positive impact in my community and help to protect the environment while doing so.

Josh Baker
Sr. Environmental Scientist – Frisco

Testimonial

BGE is a great place to work. The culture is family-oriented and flexible, and the people are awesome. As a senior project manager, I get to interact with both the BGE team as well as my clients. Believe me – you will be valued for your input as a member of this team.

Lizanne Douglas
Senior Project Manager – Houston

LET’S DISCUSS YOUR PROJECT

With extensive civil infrastructure expertise and collaboration that spans our range of disciplines, BGE is ready to help you bring your vision to life.