Our Projects
From civil engineering endeavors to complex infrastructure projects, take a deep exploration into the process and results of BGE’s many successful collaborations.
Showing results for “Technology Solutions“
Showing 1 – 15 of 19
-
South Montgomery County Mobility Plan
BGE conducted a mobility study for South Montgomery County to assess current transportation conditions and plan for future growth. Our analysis identified traffic bottlenecks, evaluated roadway infrastructure, and developed recommendations for improvements, including roadway upgrades, traffic signal optimization, and pedestrian/bicycle facility enhancements.
-
Cross Creek Ranch
BGE provided planning and engineering services for Cross Creek Ranch, a 3,200-acre master-planned community in Fulshear, Texas. Our team designed the community’s infrastructure, including roads, utilities, and parks, ensuring a high-quality living environment for residents.
-
Bridgeland
This residential first featured a thousand-acre system of interconnected lakes and streams serving aesthetic, recreational and drainage purposes.
-
Elyson
A 3,600-acre master-planned community, Elyson earned the 2017 ACEC Texas Silver Medal in Water Resources – Storm Water Management Category.
-
Big Fossil Creek Parallel Relief Sanitary Sewer Main
Phase II of a three-phase plan involved installing a new 9,157-foot, 66-inch sanitary sewer line and replacing two outdated meter stations. This upgrade improved sewer capacity and accessibility, benefiting Haltom City, North Richland Hills, and Fort Worth. The project was funded by the Texas Water Development Board and coordinated with multiple agencies.
-
Texas Heritage Parkway
To facilitate flow and eliminate head-on collisions, this four-lane boulevard exclusively features roundabouts at nine intersections.
-
IH 635/Dallas North Tollway Split Diamond Traffic Signal Design
BGE collaborated with TxDOT to design and install innovative traffic signal solutions for the Dallas North Tollway and IH 635 intersections.
-
City of Houston Asset Management
BGE assessed over 3,000 groundwater assets in Houston, prioritizing critical infrastructure for replacement and maintenance to ensure reliable water supply over the next 20 years.
-
Cinco MUD 1
Cinco MUD 1 implemented a multi-pronged approach to reduce water usage, including reclaimed water infrastructure, brackish groundwater development, and community education, saving millions of dollars and preserving precious water resources.
Testimonial
BGE is truly one team. All departments work together to provide excellent services to our clients. I enjoy working with the engineers to develop design plans that not only comply with the environmental regulations but also provide a design that exceeds the clients’ expectations.
Katelyn Heikkinen
Environmental SR. Project Manager – Frisco
Testimonial
From the first time I walked through the front doors of BGE, I could feel the family atmosphere. This makes for an enjoyable work experience. This fantastic atmosphere comes from the top all the way down to every employee.
David Salley
Director of Design and Production – Houston
Testimonial
At BGE, I get the opportunity to use the skills I have developed as an environmental scientist. Each day is a host to new challenges and provides continuous opportunities to learn and progress. I get to work with a strong team of professionals on a wide variety of project types in diverse locations. I also have the chance to create a positive impact in my community and help to protect the environment while doing so.
Josh Baker
Sr. Environmental Scientist – Frisco
Testimonial
BGE is a great place to work. The culture is family-oriented and flexible, and the people are awesome. As a senior project manager, I get to interact with both the BGE team as well as my clients. Believe me – you will be valued for your input as a member of this team.
Lizanne Douglas
Senior Project Manager – Houston